Past Projects 1

City of Concord, NH
41 Green Street
Concord, NH 03301

Project Completed: Design-build new plant control system, SCADA, and radio telemetry to replace HVAC controllers installed in 1997. Phase 1, 2 and 3 completed, Phase 4 currently under way.


City of Manchester, NH
300 Winston Street
Manchester, NH 03103

Projects Completed: Turnkey contractor for the control system on main waste water pumping station including FIXDMACS DCS, Telemetry, Graphics and PLC 5's configured as hot backup. Furnished and installed 5 new pump stations. Provided complete new plant DCS system and Y2K upgrade.


City of Rutland, VT
10 Greene’s Hill Lane
Rutland, VT 05702

Project Completed: Mechanical modifications and control system and telemetry system for main city wastewater pumping station. Project Completed: FIXDMACS SCADA system for control of entire wastewater treatment plant. Project included AllenBradley PLC’s configured as stand alone controllers communicating to the SCADA node.


Town of Merrimack, NH
P.O. Box 235
Merrimack, NH 03054

Project Completed: Comprehensive SCADA and LAN System consisting of Allen-Bradley PLC's, Fiber Optic network, Radio Telemetry System and Instrumentation.



Town of Stowe, VT
P.O. Box 730
Stowe, VT 05672

Project Completed: New water treatment plant and control system. Complete SCADA, instrumentation, and control system incorporating radio telemetry at 6 remote sites.


Pennichuck Water Works, Inc., Nashua, NH
P.O. Box 1947
Merrimack, NH 03054-1947

Projects Completed: Complete SCADA, Instrumentation and Control System for water treatment plant. SCADA Phase I (completed 8/94) consisted of furnishing, installing and programming of two FIXDMACS nodes and seven Allen-Bradley PLC’s. SCADA Phase 2 (completed 6/96) consisted of complete retrofit of existing Infilco filters and replacing existing pneumatic, with new electronic, instrumentation. Phase 3 (completed 9/97) interfaced 30 remote stations by using a combination of dial-up, leased line, and radio telemetry. Phase 4 (completed 10/98) added 15 new sites.


Manchester Water Works, Manchester, NH
1581 Lake Shore Road
Manchester, NH 03109

Projects Completed: Turnkey contractor for the complete replacement of the plant control system and new SCADA with radio telemetry. Including iFIX DCS, Telemetry, Graphics and PLC 5's and SLC 500’s. Provided complete new plant DCS system and Y2K upgrade.


Wells Sanitary District, Wells, ME
197 Eldridge Road
Wells, ME 04090

Project Completed: SCADA, instrumentation, process control and electrical system for complete plant renovation and expansion including remote telemetry system.


Town of Stowe, VT
P.O. Box 730
Stowe, VT 05672

Project Completed: Complete SCADA, Instrumentation and Control System for Wastewater Treatment Plant. Two SCADA nodes and Allen Bradley PLC’s. Complete control of treatment plant at a centralized location. Project also included extensive electrical installation.


Lewiston-Auburn Water Pollution Control Authority, Lewiston, ME
535 Lincoln Street
Lewiston, ME 04240

Projects Completed: Phase I (completed 8/97) consisted of a complete SCADA, Instrumentation and Control System for existing wastewater treatment plant utilizing Modicon Quantum PLC. Phase 2 (completed 12/97) provided a complete LAN System, additional SCADA and controls.


 

New Hampshire Department of Environmental Services, Franklin, NH
528 River Street
Franklin, NH 03235

Project Completed: New SCADA system for regional wastewater treatment plant including 17 remote sites and a remote control site with a wide area network. Four IFIX nodes and 28 PLC’s comprise this modern system.


 

York Water District, York, ME
273 Chases Pond Road
York, ME 03909

Project Completed: Complete new modernized control system for water treatment plant and remote tanks and pumping stations.


 

City of South Portland, ME
P.O. Box 9422
South Portland, ME 04116

Projects Completed: Complete SCADA, Instrumentation and Control System for wastewater treatment plant. Three FIXDMACS nodes and four Allen Bradley PLC5’s constitute this large and expandable system. Project also included extensive electrical installation.



Bath Water District, Bath, ME
1 Lambard Street
Bath, ME 04530

Project Completed: Radio Telemetry and Instrumentation System. Replaced telemetry system from existing and new tanks to Treatment Plant. Added FIXDMACS SCADA node and new master PLC.


Dexter Utility District, Dexter, ME
25 Main Street
Dexter, ME 04930

Project Completed: FIXDMACS SCADA System with Allen Bradley PLC’s to operate new water treatment facility and radio telemetry system. Also included total electrical and instrumentation system.


Berlin Waterworks, Berlin, NH
55 Willow Street
Berlin, NH 03570

Project Completed: Upgrade of existing water treatment plant and control system for new water treatment plant. Complete SCADA, instrumentation, and control system incorporating radio telemetry at 13 remote sites.


City of Eastport, ME
78 High Street
Eastport, ME 04631

Project Completed: Radio telemetry system for town pump stations (9). Included all installations and main control panel.


Town of Milford, NH
1 Union Square
Milford, NH 03055

Projects Completed: Pump Station upgrades. Allen Bradley PLC’s, controls and remote monitoring with A/B Panelview 500. Project Completed: Control, Monitoring, and Telemetering Upgrade at Wastewater Treatment Plant including SCADA and LAN System.

Copyright 2011 Electrical Installations, Inc. All rights reserved.