41 Green Street
Concord, NH 03301
Project Completed: Design-build new plant control system, SCADA, and radio telemetry to replace HVAC controllers installed in 1997. Phase 1, 2 and 3 completed, Phase 4 currently under way.


300 Winston Street
Manchester, NH 03103
Projects Completed: Turnkey contractor for the control system on main waste water pumping station including FIXDMACS DCS, Telemetry, Graphics and PLC 5's configured as hot backup. Furnished and installed 5 new pump stations. Provided complete new plant DCS system and Y2K upgrade.

10 Greene’s Hill Lane
Rutland, VT 05702
Project Completed: Mechanical modifications and control system and telemetry system for main city wastewater pumping station. Project Completed: FIXDMACS SCADA system for control of entire wastewater treatment plant. Project included AllenBradley PLC’s configured as stand alone controllers communicating to the SCADA node.


P.O. Box 235
Merrimack, NH 03054
Project Completed: Comprehensive SCADA and LAN System consisting of Allen-Bradley PLC's, Fiber Optic network, Radio Telemetry System and Instrumentation.

P.O. Box 730
Stowe, VT 05672
Project Completed: New water treatment plant and control system. Complete SCADA, instrumentation, and control system incorporating radio telemetry at 6 remote sites.


P.O. Box 1947
Merrimack, NH 03054-1947
Projects Completed: Complete SCADA, Instrumentation and Control System for water treatment plant. SCADA Phase I (completed 8/94) consisted of furnishing, installing and programming of two FIXDMACS nodes and seven Allen-Bradley PLC’s. SCADA Phase 2 (completed 6/96) consisted of complete retrofit of existing Infilco filters and replacing existing pneumatic, with new electronic, instrumentation. Phase 3 (completed 9/97) interfaced 30 remote stations by using a combination of dial-up, leased line, and radio telemetry. Phase 4 (completed 10/98) added 15 new sites.


1581 Lake Shore Road
Manchester, NH 03109
Projects Completed: Turnkey contractor for the complete replacement of the plant control system and new SCADA with radio telemetry. Including iFIX DCS, Telemetry, Graphics and PLC 5's and SLC 500’s. Provided complete new plant DCS system and Y2K upgrade.


197 Eldridge Road
Wells, ME 04090
Project Completed: SCADA, instrumentation, process control and electrical system for complete plant renovation and expansion including remote telemetry system.

P.O. Box 730
Stowe, VT 05672
Project Completed: Complete SCADA, Instrumentation and Control System for Wastewater Treatment Plant. Two SCADA nodes and Allen Bradley PLC’s. Complete control of treatment plant at a centralized location. Project also included extensive electrical installation.


535 Lincoln Street
Lewiston, ME 04240
Projects Completed: Phase I (completed 8/97) consisted of a complete SCADA, Instrumentation and Control System for existing wastewater treatment plant utilizing Modicon Quantum PLC. Phase 2 (completed 12/97) provided a complete LAN System, additional SCADA and controls.


528 River Street
Franklin, NH 03235
Project Completed: New SCADA system for regional wastewater treatment plant including 17 remote sites and a remote control site with a wide area network. Four IFIX nodes and 28 PLC’s comprise this modern system.


273 Chases Pond Road
York, ME 03909
Project Completed: Complete new modernized control system for water treatment plant and remote tanks and pumping stations.

P.O. Box 9422
South Portland, ME 04116
Projects Completed: Complete SCADA, Instrumentation and Control System for wastewater treatment plant. Three FIXDMACS nodes and four Allen Bradley PLC5’s constitute this large and expandable system. Project also included extensive electrical installation.


1 Lambard Street
Bath, ME 04530
Project Completed: Radio Telemetry and Instrumentation System. Replaced telemetry system from existing and new tanks to Treatment Plant. Added FIXDMACS SCADA node and new master PLC.


25 Main Street
Dexter, ME 04930
Project Completed: FIXDMACS SCADA System with Allen Bradley PLC’s to operate new water treatment facility and radio telemetry system. Also included total electrical and instrumentation system.


55 Willow Street
Berlin, NH 03570
Project Completed: Upgrade of existing water treatment plant and control system for new water treatment plant. Complete SCADA, instrumentation, and control system incorporating radio telemetry at 13 remote sites.


78 High Street
Eastport, ME 04631
Project Completed: Radio telemetry system for town pump stations (9). Included all installations and main control panel.


1 Union Square
Milford, NH 03055
Projects Completed: Pump Station upgrades. Allen Bradley PLC’s, controls and remote monitoring with A/B Panelview 500. Project Completed: Control, Monitoring, and Telemetering Upgrade at Wastewater Treatment Plant including SCADA and LAN System.